Wood Acclimation
Menu

From truck to prepared stack

Plan the receiving area before delivery, then begin the storage record as the boards are unloaded.

DELIVERY / TWO POSSIBLE PATHS

Handle once.
Prepare before the truck.

HANDLE TWICE ONE ADDITIONAL TRANSFER

DeliveryTemporary pileExtra transferPrepared sticker stack
Aligned supports and stickers with air paths shown conceptually. Elevation, spacing, lifting equipment and crew requirements must follow the supplied material and site plan.
  1. 01Truck arrives
  2. 02Temporary pile
  3. 03Crew returns / move again
  4. 04Finally sticker stacked

HANDLE ONCE STORAGE PREPARED IN ADVANCE

DeliveryDirect to the prepared stackPrepared sticker stack
Aligned supports and stickers with air paths shown conceptually. Elevation, spacing, lifting equipment and crew requirements must follow the supplied material and site plan.
  1. 01Stack location prepared
  2. 02Truck arrives
  3. 03Boards placed with stickers
  4. 04Observation record begins
×=66.7additional modeled minutes

Example assumptions, not measured productivity. Boards × seconds per extra transfer ÷ 60. Excludes travel, equipment, crew size and lifting constraints. No labor saving or safe lifting method is promised.

Prepare your delivery checklist ↗